Let's get physical: Better engineering and installation practices
Written by Ian Verhappen May 17, 2005
The physical layer is the lowest of seven layers in the Open System Interconnect (OSI) model. It is also the most important layer because everything above it depends on signals transmitted from point A to point B with no deterioration. Foundation Fieldbus and Profibus PA use the same wiring and termination equipment-or physical layers-to transmit power and signals.
Fieldbus systems, which are wired in parallel, have unique requirements. Research shows that 80 percent of fieldbus installation problems are due to the physical layer, which is the signal transportation medium. We often blame the technology when our systems don't work, but end users can prevent many problems through good engineering and installation practices.
In certain circumstances, fieldbus technologies are better than analog ones. Fieldbuses are less susceptible to noise because they determine signals-in this case, "ones" and "zeros" from the transition-from one state to the other. Conversely, analog signals infer signals from the magnitude of the output.
Another advantage with fieldbus is that the host system becomes aware immediately when a signal fails. That's not the case with analog technologies. When a signal fails in an analog system, output could show a "zero shift" due reasons such as lower-than-necessary voltage and higher current drop, and result in a "true" system reading of 37.5 percent, or 10 mA, when in fact it's 50 percent, or 12 mA. The host system would not be aware, and everything would operate under these incorrect conditions until the next scheduled maintenance cycle.
Minimizing problems
The first step in minimizing physical layer problems is to ensure that everyone associated with the automation project receives training. Training can be as simple as spending two to four hours with electricians and installers. Everyone on the project, especially the electricians and installers, needs to know that fieldbus is a parallel wiring situation and that two terminators must be installed on each segment. Other items that the electricians and installers should know about are related to grounding and the need to be careful with the shield foil as it can cause sporadic problems that are the most difficult to resolve.
The design team should also ensure that all instructions sent out to the field are correct so the likelihood of difficulties later on is small.
Fortunately, many manufacturers of physical layer devices are making their equipment more modular with fewer connections, which means there's less room for error. Using a preconfigured field junction box to collect the spurs from each device minimizes the number of connections in the field, provides a consistent quality of termination, and reduces the field construction time so the net effects are project savings and a more reliable system.
Ian Verhappen is an ISA fellow and director of ICE-Pros, Inc., an independent instrument and control engineering consulting firm specializing in fieldbus, process analyzer sample systems and oil sands instrumentation and control. E-mail him at This e-mail address is being protected from spambots. You need JavaScript enabled to view it , or visit his website www.ICE-Pros.com.
Tagged under
An increased focus to comply with regulations and the need to reduce safety injuries are driving organizations to adopt new strategies and technologies to ensure the safety of people, processes…
Category: Columns
Read more...
Washington Mills Electro Minerals Corporation, a manufacturer of mineral products, was fined $70,000 for a violation of the Occupational Health and Safety Act after a worker was injured.
Category: News
Read more...
Scotlynn Investments Inc., the Norfolk County operator of Scotlynn Farms, a ginseng farm and processing plant, was fined $50,000 for a violation of the Occupational Health and Safety Act after…
Category: News
Read more...
Since its launch in December 2008, the first edition of CSA Z462-08 Workplace Electrical Safety has had a significant impact on the electrical industry. Next to the Canadian Electrical Code,…
Category: News
Read more...
Sealed Air (Canada) CO/CIE, a Nova Scotia manufacturer of packaging products, was fined $55,000 for a violation of the Occupational Health and Safety Act after a worker was injured.
Category: News
Read more...
Alberta courts sent a strong message in 2011 that workplace health and safety must not be compromised. The penalty total of more than $3.4 million is the second highest ever,…
Category: News
Read more...
KSR International Co., carrying on business as Dresden Industrial-Ridgetown, a maker of vehicle parts, was fined $50,000 for a violation of the Occupational Health and Safety Act after a worker…
Category: News
Read more...
Caterpillar Tunneling Canada Corporation, a Toronto-based company that designs and builds tunnel boring machines (TBMs) used to dig underground circular tunnels, was fined $130,000 on December 22, 2011, for violating…
Category: News
Read more...
| Latest Products
|
MA Online Resource Centre
-
Videos
-
Manufacturing Automation's Editor Reports
Get the latest industry news from our magazine's editor
-
Manufacturing Automation's Editor Reports